☰ Menu
Shop
Get a quote
Builder portal
Inspections
Help ▾
How it works
Delivery
Technical resources
Send us your materials list
FAQ
Contact
English
中文
हिन्दी
ਪੰਜਾਬੀ
دری
Cart (
0
)
Daily pre-start
PORTAL PREVIEW (MOCKUP)
Preview: example screen.
The builder portal is not live yet. Nothing on this page is saved or sent.
Request early access
.
← My jobs
·
12 Banksia St, Werribee
· 24/10/2026
Supervisor
Start time
Conditions
Weather checked. Wind and rain suit panel and adhesive work
Set-down area clear, flat and away from footpaths
Exclusion zone set for lifting and cutting
Plant and access
Hiab operator licensed, lift zone clear, overhead wires checked
Scaffold tagged or EWP pre-start done
Saw has dust extraction or wet cutting
PPE
Hard hat, hi-vis, boots, gloves
Eye and hearing protection
Fit-tested P2 or better respirator for cutting
Hazards today
Site-specific SWMS
The Facadia SWMS is a general template only. It must be reviewed and adapted to each site by the PCBU or installer before use. To the extent permitted by law, Facadia accepts no responsibility for how it is used on site.
I (PCBU / installer) have reviewed this SWMS and adapted it to this site, this work and this crew
Crew sign-on
Name
Company
Signed
[EXAMPLE]
[EXAMPLE]
Done: 07:04
Sign
Save pre-start (preview only)
Brands we stock
BESTARI
BESTARI
BESTARI
BESTARI
Delivered to site
Instant invoices · bank transfer
Facadia Pty Ltd, ACN 703 611 241
03 9021 2005
· Mon–Fri 0700–1600